Optimal Bread Production Operator Placement by Using Hungarian Method
Abstract
CV Roti Bangkit is a home industry that produces packaged bread with various variations. CV Roti Bangkit is addressed in Kadisono, Tegaltirto, Berbah District, Sleman Regency, Special Region of Yogyakarta. Operator placement is done randomly in the manufacturing of oval cheese so that production targets are often not achieved. Therefore it's necessary to look at the position of operators.The problem of optimal operator placement can be done using the Hungarian method. Time data for each operator is measured for each work element, and the standard time is calculated. After receiving the most optimal operator placement, we can calculate the increased productivity before and after applying the assignment method. Based on this research, the standard operator time before applying the assignment method is 90.96 seconds, and after using the assignment method is 75.41 seconds. The level of productivity based on standard output calculations before and after the application of the assignment method increases productivity by 27.28%
References
Kuru, K., Ansell, D., Khan, W., & Yetgin, H. (2019). Analysis and Optimization of Unmanned Aerial Vehicle Swarms in Logistics: An Intelligent Delivery Platform. IEEE Access, 7. https://doi.org/10.1109/ACCESS.2019.2892716
Lukodono, R. P., & Ulfa, S. K. (2018). DETERMINATION OF STANDARD TIME IN PACKAGING PROCESSING USING STOPWATCH TIME STUDY TO FIND OUTPUT STANDARD. Journal of Engineering And Management In Industrial System, 5(2). https://doi.org/10.21776/ub.jemis.2017.005.02.5
Muhartono, A., HM, G. B., & Suparto. (2020). Pengukuran Produktivitas di PT. XYZ dengan Metode APC (AMERICAN PRODUCTIVITY CENTER) dan MARVIN E. MUNDEL. Seminar Nasional Sains Dan Teknologi Terapan VIII 2020, 53(9).
Panudju, A. T., Marfuah, U., & Mutmainah. (2021). The Measurement of Standard Time for Analysis of Output Standards in the E-Commerce Process. International Journal of Research and Innovation in Applied Science, 06(05). https://doi.org/10.51584/ijrias.2021.6508
Ramadhan, I. A. P., & Waluyo, M. (2020). Pengaplikasian Metode American Productivity Center ( APC ) Pada Pengukuran Dan Perencanaan Produktivitas Di PT. XYZ. Jurnal Manajemen Industri Dan Teknologi, 01(05).
Rusdiana, S., Oktavia, R., & Charlie, E. (2019). Application Of Hungarian Method In Optimizing The Scheduling Of Employee Assignment And Profit Of Home Industry Production. Journal of Research in Mathematics Trends and Technology, 1(1). https://doi.org/10.32734/jormtt.v1i1.754
Sari, G. A., Herwanto, D., & Nugraha, B. (2021). Optimalisasi WAKTU KERJA DAN JARINGAN PENDISTRIBUSIAN MAKANAN RINGAN MENGGUNAKAN MODEL ASSIGNMENT DAN HUNGARIAN. Inaque : Journal of Industrial and Quality Engineering, 9(1), 81–95. https://doi.org/10.34010/iqe.v9i1.4364
Son, M. J., & Kim, T. W. (2014). Business process management-based job assignment in ship hull production design. Ocean Engineering, 88. https://doi.org/10.1016/j.oceaneng.2014.05.010
Copyright (c) 2024 ICEETE Conference Series

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher, except in the case of brief quotations embodied in critical reviews and certain other noncommercial uses permitted by copyright law. For permission requests, write to the publisher at the address below.
The ICEETE Conference Series on Economy, Education, Technology, and Environment retains the copyright of all published papers. Any unauthorized reproduction or distribution of the conference papers will be considered a violation of copyright. Permission to use the content of this conference series for any purpose must be obtained from the copyright owner.